Scheduling
Video Walkthrough
Section titled “Video Walkthrough”Some menu items and features as shown in the video and images below may have changed as we are updating the app during the beta period.
Publishing to schedule
Section titled “Publishing to schedule”After you have finished breaking down your script, you can move on to scheduling.
- Click the film slate icon.
- Select
Publish Schedule
After clicking Publish Schedule you will be given the option to assign scene numbers and lock pages before you proceed if you have not yet done so.
You will be asked to name the version of the script to publish to schedule. You will also be asked whether you want to add any missing cast and set taggings. These missing taggings are drawn them the speaking characters and scene headings of scenes that you did not tag them.
Click Publish version when you’re ready. Then click Open Schedule.
Schedule Settings
Section titled “Schedule Settings”When you first publish the script to the schedule, you will be asked to choose some initial settings. You can modify all of this later on. The settings are:
- Starting Date
- Day Length
- Day Start
- Working Days
Starting Date
Use the calendar to select the date you plan to start filming.
Day Length
Day Length is how many hours in a day you plan to shoot. It’s used to help schedule and let you know which days are overscheduled.
Day Start
Day Start is which time you plan to starting shooting each day.
Working Days
Select which days of the week you plan on working. (Later on you can select specific dates as Days Off for holidays, etc.)
Navigating the Stripboard
Section titled “Navigating the Stripboard”When you first open the schedule your stripboard will be blank, and all the strips will be located in the Unscheduled Strips section at the bottom. You can sort the strips there and drag them up onto the stripboard. More on that later.
Schedule settings/Inspector Window
Section titled “Schedule settings/Inspector Window”To change the settings for your schedule, click the i “inspector” icon. This is where you can edit the Starting Date, Day Length, Day Start, and Working Days.
You can also edit the “Hours per page,” which is used to estimate how much time each scene will take to shoot.
Navigating back to your script
Section titled “Navigating back to your script”To get back to your script:
- Click on Schedule at the top of the window.
- Click on the script name in the drop down menu.
To see more info on a strip or to edit the info, click on the strip and it will open an inspector window on the right.
To see all your resources (sets, cast, crew, etc) and various reports and documents, open the left sidebar.
Editing your sheets
Section titled “Editing your sheets”To see all your sheets and make edits to them, click on All Sheets in the left sidebar. Then click on the sheet you’d like to edit to open it in the inspector window on the right.
In the Inspector window you can add and edit information, including:
- Day/Night
- Int./Ext.
- Script Day
- Pages
- Setup time
- Shooting Duration
- Shots
- Estimated screen time
- Synopsis
You can also click “Open in Script” to open that scene in a new window for reference.
Setting the Shoot Duration
Section titled “Setting the Shoot Duration”Each sheet will have an estimated shooting time attached to it calculated by Arc Studio based on the page length and whether it’s Day/Night or Int./Ext. The Estimated Time will be used as the Shoot Duration until you set your own.
(You can change the amount of time estimated for each page in the board inspector.)
Edit the Shoot Duration in the Inspector window or in the table.
Changing the set for a sheet
Section titled “Changing the set for a sheet”In this example the set in Sheet 8 is called “Detective’s Office” when it should be “Detective Office” to match Sheet 3. This means the sheets are indicated as two different sets instead of one.
To correct the set, click Change Set in the inspector window. Search for the correct set (or create a new set) and select it.
Adding locations to sets
Section titled “Adding locations to sets”To add an address to a set, click on Set in the left sidebar. Then click on the set and add the address in the inspector window on the right.
Availability of Resources
Section titled “Availability of Resources”To set the availability of various resources, like sets, cast, and crew, click on the appropriate category in the left sidebar and then click on the resource to open its inspector window.
In the inspector window, click on Set availability to set the availability of the resource. This will launch a calendar modal where you can choose the availability.
The calendar will default to making the resource available for all the shoot days. (If you haven’t made your schedule yet, it will only initially show the first day.)
Manually sorting your unscheduled strips
Section titled “Manually sorting your unscheduled strips”Your unscheduled strips will initially be listed in scene order, but you can sort them based on the various columns in priority. Sort by the first priority, then the second, third, etc.
Dragging unscheduled strips onto the board
Section titled “Dragging unscheduled strips onto the board”You can drag unscheduled strips onto the board individually or by multi-selecting them.
Auto-sort strips
Section titled “Auto-sort strips”To Auto-sort the strips, click on the … menu and select Auto-sort strips
Group by Location
Section titled “Group by Location”In the … menu select Group by Location to group together all strips with the same Set name that are in continuous order. This will make those strips move as a group.
To ungroup a Strip, right click on it and select Ungroup.
Move to Board
Section titled “Move to Board”In the … menu select Move to board to move all the Unscheduled Strips up onto the board in their current order. This will also add day breaks based on the Shoot Duration and the amount of time you’ve set for each shooting day.
Working with the stripboard
Section titled “Working with the stripboard”You can rearrange the strips by dragging and dropping them on the board.
Stripboard Display Settings
Section titled “Stripboard Display Settings”Click on the display settings icon in the top right to change and rearrange the columns, as well as changing the other view settings, including:
- Hide Setup/Travel banners
- Display Set location (if you’ve added an address to the set)
- Display Slug color
Customizing Slugline Colors
Section titled “Customizing Slugline Colors”You can customize the Slugline Color in the settings under Production → Slugline Colors
Saving Board Display Views
Section titled “Saving Board Display Views”Stripboard Filters
Section titled “Stripboard Filters”Click on the filters icon in the top right to filter the strips on the stripboard.
Adding day breaks and banners
Section titled “Adding day breaks and banners”To add a day break, either click + Add day break at the bottom of the stripboard, or click on a strip and select Add day break below
Day Banners
Section titled “Day Banners”The day banners will show the total shoot duration of that day, which includes the shoot duration of all the strips plus any travel/setup times that you have added.
Click on a Day Banner on the stripboard to open the inspector window for that day. This will show you more information, including what resources are being used that day.
You can edit how long the shooting day will be (Day Length) and what time you’ll start filming (Day Start)
Splitting strips
Section titled “Splitting strips”To split a strip, right click on it and select Split strip. This will create a duplicate of the strip with a “b” appended to the name. (Splitting 8 will create 8b). You can then adjust the shooting times and page counts for each of the strips.
Conflict and Warning Flags
Section titled “Conflict and Warning Flags”If the schedule detects an issue, like a resource is unavailable on the day it is scheduled or the strip will not git in the day, you will see a yellow or red flags on the board. Hover over the flags for more information.
You can also see the flagged information in the inspector window for the day or the strip.
Setting Days Off
Section titled “Setting Days Off”If there are certain days that you will not be working, you can mark them as Days Off via the calendar.
- Select Calendar in the left sidebar
- Right click at the top of the day on the calendar
- Select Mark as Day Off
To undo this, right click on the top of the day to Unmark as Day Off
Creating new schedule versions
Section titled “Creating new schedule versions”When creating a new schedule version, you can either create a blank one or duplicate the current version.
Click on the name of the schedule in the breadcrumbs at the top of the window. The default name will be Main Schedule
To create a new blank schedule, click on + New schedule version. Give it a name and choose the schedule settings you’d like for this version.
To create a new duplicate schedule, click on Duplicate this version. This will use the same settings (start date, etc) as the current schedule.
Navigating between schedule versions
Section titled “Navigating between schedule versions”Click on the name of the current schedule that you’re viewing in the breadcrumbs at the top of the screen, then click on the Schedule you’d like to see.